Fernox Express Boiler Commissioning Kit

Availability:

Out of stock


Maintain the design specification and energy efficiencyRestore energy efficiencyInhibit the formation of scale and sludge

$102.48

Out of stock

Want to be notified when this product is back in stock?

Kit Includes: (1) 17.6oz/500ml Fernox Protector F1, (1) 17.6oz/500ml Fernox Cleaner F3, (4) Fernox pH Test Strips, Instruction Leaflet

Good practice dictates that hydronic central heating systems should be thoroughly cleaned and flushed before installing a new boiler, after which a chemical inhibitor should be added to ensure the system is protected from corrosion, scale and sludge build-up. These procedures should also be employed when major work is carried out on a system. A clean, protected system helps ensure that the heat generated by the boiler is transmitted efficiently into the house over long term.

Maintain the design specification and energy efficiency

Restore energy efficiency

Inhibit the formation of scale and sludge

Minimize corrosion of system metals

SKU: 4002.9528 Category: